Siemens S7-300 to S7-1500 Migration

Off S7-300. Into S7-1500 and TIA Portal, on your outage schedule.

Scoped at the machine, staged around your outage windows, and brought live on the floor by an on-site team from Anderson, SC.

Send an RFQ · Office: (864) 526-9202 · Line down? (864) 526-7779, 24/7

If your line runs on an S7-300, the clock is already running. Siemens announced the phase-out of the S7-300 and ET 200M families on October 1, 2023, and on October 1, 2025 they moved to spare-parts-only status. The spares supply is expected to run for years, but every year the shelf gets thinner, surplus prices climb, and the people who know STEP 7 Classic retire or move on.

TS Controls migrates S7-300 and S7-400 systems to S7-1500 (or S7-1200 on smaller machines) in TIA Portal. We do it on-site, planned around the outage windows your plant can give. We're based in Anderson, South Carolina, and we work across the Southeast and nationwide.

Why plan the migration now

  • The failure picks the date if you don't. A failed CPU or I/O card with no spare turns a planned project into an emergency in the middle of a shift.
  • The software is aging too. Many STEP 7 V5.x / SIMATIC Manager projects live on a single old laptop. TIA Portal puts the controller, HMI, and drives in one current project your team can maintain.
  • Planned work costs less. A staged migration fits the outages you already have. An unplanned one creates its own outage.

What changes from S7-300 to S7-1500

Today After migration
S7-300 / S7-400 CPU S7-1500 (or S7-1200 on small machines)
ET 200M distributed I/O ET 200SP / ET 200MP, or keep the existing I/O where a staged plan allows
STEP 7 V5.x / SIMATIC Manager TIA Portal
MPI and PROFIBUS DP PROFINET, with PROFIBUS kept where it makes sense
OP / TP panels, WinCC flexible Comfort Panels and WinCC in TIA Portal
F-CPU safety (where present) S7-1500F safety in TIA Portal, revalidated

The right path for your line comes out of the audit: I/O count, networks, safety, HMIs, and how much outage time you can give it.

How we migrate

1. Audit at the machine. We collect the STEP 7 project (and confirm it matches what's running), the hardware configuration, the network layout, and everything connected to the controller: panels, drives, and other PLCs on MPI or PROFIBUS. We photograph the racks and note what's undocumented.

2. Convert, then clean up. TIA Portal can migrate a STEP 7 project, but going from S7-300/400 to S7-1500 changes addressing, data handling, and some instructions. We review and rework the converted code and document it as it moves, so the next person can read it.

3. Stage the hardware. TIA Portal supports S7-300 and S7-400, so one option is to move the project into TIA Portal on the existing CPU first and swap to S7-1500 in a later outage. Another is to keep the distributed I/O and field wiring while the controller changes. We lay out each option and the outage it needs.

4. Test before cutover. Logic, I/O mapping, and HMI tags are checked before the outage, with a way back to the old controller if the line needs it.

5. Cut over and prove it. We're on-site through the outage and startup: cycle, safety, and operator acceptance before we leave, then documentation and a clean handoff to your maintenance team.

Staged or all at once

There's no single right answer. Common patterns:

  • Software first. Move to TIA Portal on the existing hardware now, and swap the CPU in the next shutdown.
  • Controller first, I/O later. A new S7-1500 talks to the existing distributed I/O. Field wiring stays put.
  • Line by line. Migrate one cell or line per outage, keeping the rest running on the old platform.
  • Whole cell in one outage. Fastest overall if you have a long enough shutdown and good preparation.

S7-400 and Step 5 too

S7-400 systems follow the same path to S7-1500. Step 5 (S5) systems are older still: Siemens' S5-to-S7 converter handles part of the code, and the output needs rework by someone who reads S5. See our S5 and S7 to TIA Portal migration page.

What to send for a migration quote

  • The archived STEP 7 project (or TIA Portal project if you've started), plus any HMI projects
  • The hardware list or electrical drawings, if you have them
  • Photos of each rack and the network hardware
  • Your outage windows for the next 6–12 months

Zip the files and upload them with the RFQ form (up to 10 MB), or email sales@ts-controls.com. See our Siemens technical reference for more on what helps.

Work we've done

Plants we've supported include BMW Plant 10, Mercedes-Benz U.S. International, Tesla, and Robert Bosch LLC.

New customers: Send us a written, like-for-like quote from another integrator and we'll beat the labor price by 15% on your first purchase order. Excludes emergency line-down work, time-and-materials jobs, materials, and change orders. Final price confirmed in writing by TS Controls.

Send your STEP 7 project, rack photos, and outage windows.

FAQ

Frequently asked questions

Is the S7-300 really end of life?

Siemens announced the phase-out of the S7-300 and ET 200M on October 1, 2023, and they became spare parts only on October 1, 2025. Spares remain available for a period, but supply shrinks over time, so planning the migration now avoids an emergency later.

Can we migrate in a single weekend outage?

Sometimes. It depends on the I/O count, networks, HMIs, safety, and how much preparation and testing is done before the outage. Many plants stage the work, moving the software first and the hardware later, to fit shorter outages.

Do we have to replace the I/O and rewire?

Not always. Depending on the system, a new S7-1500 can run existing distributed I/O while the controller changes, and field wiring can stay in place. We lay out the options at the machine.

Can you convert our STEP 7 project to TIA Portal?

Yes. TIA Portal can migrate STEP 7 projects, and we review and rework the result because the move to S7-1500 changes addressing and some instructions.

What happens to our HMI panels?

Older OP and TP panels and WinCC flexible projects usually move to Comfort Panels and WinCC in TIA Portal. We include the HMI in the migration plan so tags and screens match the new controller.

Do you have TIA Portal licenses?

Yes. We carry licensing for current TIA Portal versions.

Do you travel outside South Carolina for migrations?

Yes. We are based in Anderson, SC, and do on-site migrations across the Southeast and nationwide.

Request a quote

Get a migration plan before the spare runs out.

Send the project and we’ll come back with options and the outage each one needs. S7-300 down today? Call the 24/7 line.

Office: (864) 526-9202 · 24/7 line-down: (864) 526-7779 · sales@ts-controls.com

New customer? Send us a written, like-for-like quote from another integrator and we'll beat the labor price by 15% on your first purchase order. Excludes emergency line-down work, time-and-materials jobs, materials, and change orders. Final price confirmed in writing by TS Controls.

TS Controls Anderson, SC Office: (864) 526-9202 · Mon–Fri, 9:00am–5:00pm ET, by appointment 24/7 line-down: (864) 526-7779 sales@ts-controls.com · On-site service nationwide from Upstate South Carolina
Request type

PDF, Office, ZIP, or drawing, up to 10 MB; zip project files (ACD, RSS, TIA archives) first. It is emailed to sales@ts-controls.com.

Line down? Call (864) 526-7779, 24/7.

Line down Send an RFQ